PROJECT DETAILS
- Completion Date
- March 2022
- Client
- CDC Construction
- Task(s)
- Window Frosting
- Category
- Window Frosting
A unique window frosting design was produced and installed in the brand new Burnaby Hospital Office building. The frosting design remained continuous amongst all the offices in the same corridor. The precision required to ensure the lines and waves all matched up was required.